Installation of solar panels
By the end of 2022, we want to install 1,800 m2 of solar panels on all our suitable roofs.
Stay updated with all our breathtaking news about innovations, care of nature and people.
By the end of 2022, we want to install 1,800 m2 of solar panels on all our suitable roofs.
We are JobRad employers
After the installation of the first centrifugal plant in Weißenhorn in 2020 and the commissioning of a second plant in Neu-Ulm by the end of this year, we will save up to 3500 t of CO2 per year.
Since 2021, we have been using 100% electricity from renewable energy sources and have taken steps towards production flexibility.
Restoration of nature
We have set out an ambitious strategy to achieve climate neutrality at all our sites by 2040
In 2021, we have installed six charging stations for electric cars
In 2020, 50,500 tonnes of salt slag were produced, which we transport to a specialised recycling plant
With more than 75 years of experience in the market, we have achieved outstanding know-how in the production of high-quality aluminium alloys from scrap, with our end products consisting of up to 95% recycled material
By recycling our salt slag, we can reduce the waste generated on site and reuse the salt directly in our production process.
The installation of the process control system is part of the Industry 4.0 transformation at Oetinger.
In total, we have replaced over 400 light bulbs.